Easter 2018
Not a good visit over Easter with problems with new section of site. Definitely not teething problems. Mains for whole section kept failing, placing of water pressure in new toilet block, many of the new section pitches flooding. Yes rain was heavy but these new pitches quickly flooded. The land on which the new section has been built was often water logged and I was surprised that the site was extended on to this land. It felt that the new section had been rushed into service for Easter, without proper testing. I am an electrical engineer by profession.
Follow